Create a Multi-Lane Customer Quote
Use this workflow when one customer quote should show several lane options or lane charges on the same PDF. Each quoted lane is entered as a separate row in the Commodities and Accessorials table, and the quote pulls those rows into one total. After the customer accepts a lane, create or update the actual load your team will dispatch and bill.
Set Up a Lane Type (once)
Skip this if your company already has a Commodity or Accessorial Type for lane rows.
- Go to All Loads >> Commodity Type and click Add New.
- Enter a short code such as LANE and a clear description, such as Quoted lane.
- Set the type to Commodity or the customer-facing type your company uses for quote lines.
- Make sure the type is Active. Do not select Hide on Customer Invoice if the lane line should print on the quote.
- Save the type.

For more detail, see All Loads >> Commodity Type Overview.
Create the Quote Load
- Create a new load and select the customer or payer.
- Set the load status to Quote.
- Enter the pickup and delivery information for the quote header. For several lane options, use the first pickup and final delivery or another representative lane.
- Enter 0.00 for the main customer flat rate and customer miles charge, because all lane pricing goes in the Commodities and Accessorials table.
- Save the load.

Enter Each Lane
- Open the saved quote load and scroll to the Commodities and Accessorials table.
- Add one row for each lane.
- In Qty, enter the number of miles, or 1 to quote the lane as a flat amount.
- In Type, select the lane type, such as LANE.
- In Description, enter what the customer should see, such as origin, destination, mileage, equipment, or a lane note.
- In Customer Rate, enter the rate for the row (the rate per mile, or the total lane amount if Qty is 1).
- Check the calculated Customer Charges, then save the load.
Open or Email the Quote
- Click the customer Quote button on the load.
- Review the PDF: each lane should show the correct description and amount, and the total should be correct.
- Use the email option beside the quote button to send it from Load Manager.
If the quote includes a deposit or partial payment, enter it as a separate Payment Advance row so the quote shows the remaining balance due.
Troubleshooting
- A lane does not appear on the quote: Check that the row has a customer amount or weight and that the type is not hidden from the customer invoice.
- The quote total is too high: The main customer flat rate or miles charge may still be filled in while the same amounts are also entered as lane rows.
- The row amount is wrong: Review Qty, Customer Rate, and Customer Charges.
- The quote email wording is wrong: Review the default customer quote email subject and body in Settings >> Configuration Options.
Related Articles